Deck roofs on steel deck

Mechanical fastening of insulation and waterproofing membrane (PVC, TPO, EPDM or bituminous) to steel deck, with telescopic sleeve + screw systems or screws with stress plates.

Where it is used. Large flat roofs (logistics, industry, shopping centres) on 0.6 to 1.25 mm steel deck, with PIR or mineral wool insulation.

3D illustration: Deck roofs on steel deck

How to install

  1. Lay the vapour barrier and place the insulation boards staggered on the deck crowns.
  2. Fix each insulation board with 6 fasteners: 4 at the corners and 2 in the centre.
  3. Lay the waterproofing membrane and fix it along the lap edge with the chosen fastener: telescopic sleeve + screw or screw + stress plate.
  4. Always screw into the deck crown; the screw must pass through the deck by at least 20 mm.
  5. With a sleeve, the screw sits fully inside it; choose the length from the table on the product page according to the insulation thickness.
  6. Lap the next sheet over the fasteners and weld it. The number and layout of fasteners come from the wind uplift calculation.
Installation diagram: TRPS-45 telescopic sleeve + screw system on steel deck
TRPS-45 telescopic sleeve + screw system on steel deck
Installation diagram: EDS-B screw with Ø50 stress plate
EDS-B screw with Ø50 stress plate
Option with screw and stress plate
Option with screw and stress plate

Recommended fasteners

Data sheets and DoPs →

Guidance only. The type, length and number of fasteners depend on the project, the substrate and the wind uplift calculation; please consult us for each project.